FFM designed and project managed the installation of a $20,000 water retention project that is used to divert the waste water from the main drainage pipe of the fire service sprinkler system during weekly testing into newly installed holding tanks. The water is then used for irrigating the garden on the podium level. An estimated 8000K/L will be harvested annually, as well as an additional 600K/L of water from rainfall based on assumption of average rainfall per year and roof area. The project has attracted a $9,500 rebate from City West Water and will also provide the building with water cost savings into the future.